project details

Client: Arlington States
Project Start: April 2022
Product Required: Panel , Invertor
Client Location: Harare , Zimbabwe

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.DOC
1.25M

Let’s Start Work
Together

Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.

Problem Description

Project Summary

ZETDC has not provided electricity to all the households in Arlington estate. This warrants the need for a reliable source of electricity with low or no maintenance cost, environmentally friendly and convenient. The solution provided for this particular homestead is a 5,6KVA solar system consisting of a 14,4KWH battery bank and 4,65KW peak solar panels. This system provides electricity for entertainment, lighting, WI-FI, security systems, borehole pumps, refrigeration, ironing etc.

 

Problem Description

  • The newly developed phase 5 of Arlington Estate has no electricity yet but the family needs electrical power for entertainment, lighting, internet services etc.

 

  • The homestead has no utility water thus the need to have a borehole system which requires electrical power for proper water reticulation.

 

  •           Due to unavailability of electricity it is also difficult to keep certain foods cool or frozen hence the need for a reliable source of electricity for refrigeration.

 

Our Approach And Solution

Solution Description